Location & Transportation
Basic Facilities
Human Resource
Development
未来展望
Departments of Different Functions
Investment Promotion Bureau
+86-512-52575688

SectionⅠof Investment Promotion Bureau(Taiwan & Southeast Asia Division)
+86-512-52579688、52579915

Section Ⅱ of Investment Promotion Bureau(Europe & North America Division)
+86-512-52579907、52579901

Section Ⅱ of Investment Promotion Bureau (Japan Division)
+86-512-52579893、52579926、52579073、52579500

Section Ⅲ of Investment Promotion Bureau(South Korea Division)
+86-512-52579960、52579963

Section Ⅳ of Investment Promotion Bureau (Taiwan & Southeast Asia Division)
+86-512-52579965、52579969
   
  · Current Position :HOME > General Introduction > Basic Facilities
1、Power Supply:
CSDZ is equipped with two 220KV substations and four 110KV ones. Power supply wires of 10KV, 35KV and 110KV, etc. are available within the development zone.
2、Water Supply & Drainage:
With rich water resource from Yangtze River and Sunhoo Lake, daily water supply capacity reaches 700,000 tons. And water quality has reached Grade Ⅱ of the State Drink Water Quality Standard.
Pipes for water supply and drainage are laid to the red border line of workshop sites.
3、Sewage Treatment:
CSDZ is equipped with three sewage treatment plants with total capacity of 140,000 tons, one 60,000-ton plant and two 40,000-ton ones.
4、Telecommunications:
Internet access, International Digital Data Network (DDN), International & Domestic Direct Dial, IP phone, telegraph, fax, mobile communications and radio communications, etc. are available in the Zone.
5、Steam Supply:
Being an important heat supply base in the southeast of Changshu, KunCheng Thermoelectric Power Plant has been set up in CSDZ with installed capacity of 48,000 KW.
6、Road:
Within the development zone, 100 kilometers of main roads (50~60 meters wide) have been built with green belts (10 meters wide) along both sides. And buses have been put through all these main roads.
7、Natural Gas
Piped natural gas from the State Project of “Diverting Gas from the West to the East” reaches Changshu at the pressure of 0.6-1.6Mpa. DN300 pipes for MV (0.2-0.4 Mpa) gas supply have been laid along the main roads of CSDZ.
8、Land Leveling
CSDZ will afford land leveling of the sites recommended to investors.
9、Logistics
Three logistic centers, HuaKun, MengLan and AnDaZhou, have been built within the development zone. With large warehouses and big transportation capacities, they provide 24-hour services.
 
TEL:+86-512—52579908  FAX:+86-512—52579902  苏ICP备05040749
Copy Rights (C) 2006 Changshu Southeast Economy Development Zone of Jiangsu All rights reserved    Design :www.eweb.cn